Motorists are advised of changed traffic conditions from Sunday 16 September on the Oxley Highway to allow for night work to be carried out as part of the Spencers Cutting upgrade.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Traffic will be reduced to one lane to allow for a new water main to be built.
The work will be carried out at night to minimise impact to motorists. The work will take five nights to complete and will be carried out between 6pm and 5am, weather permitting.
Lane closures, traffic control and a reduced speed limit will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
Roads and Maritime thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit www.livetraffic.com or call 132 701.